model |
LE-300C | LE-450C | LE-500C | |
Configuration notes | ||||
hardware configuration |
transmission system | A section of track | ||
holding device | Hold and fix the workpiece up and down | |||
frame construction | Steel structure | |||
navar | Industrial computer/motion control card | |||
Driving modes | Servo system/screw drive | Servo system/electric cylinder transmission | Servo system/screw drive | |
Number of drive shafts | Three shafts | Three shafts | Four shafts | |
monitoring unit | Ultraviolet detection | |||
cleaning device | The cleaning of the glue valve can be set at regular times to ensure the cleanliness of the valve body | |||
Waste liquid recovery device | The waste liquid device generated during the recovery and debugging can ensure 24 hours of continuous operation without waste liquid treatment | |||
Z-axis configuration |
Number of glue valves | Two | ||
Nip valve coating width | 2mm | |||
Fine mist coating width | 6-8mm | |||
feed system |
Storage drum 1 capacity | 10L*1 | ||
Storage drum 2 capacity | 2L*1 | |||
stirring method | Manual/pneumatic mixing | |||
technical parameter | ||||
effective travel | Coverage | L70*W50mm~L450*W300mm | L70*W50mm~L450*W450mm | L70*W50mm~L500*W500mm |
Efficiency and precision |
positioning accuracy | ±0.02mm | ||
repeatability precision | ±0.02mm | |||
maximum work rate | 600mm/sec | |||
Paint edge clarity | ±0.5mm | |||
spraying thickness | 0.03 mm --1mm | |||
transmission system |
Transmission direction | L←→R | ||
High transmission | 900mm±20mm | |||
Overboard height | ±100mm | |||
Modulation mode | hand movement | |||
overall unit |
Program storage quantity | More than 10,000 | ||
operating system | Windows 7 operating system | |||
Programming approach | teach /CAD | |||
Air source requirements | 0.5Mpa~0.8Mpa | |||
Air source flow | 150CFM~200CFM | |||
source | AC220V 50~60Hz 1.5kw | AC220V 50~60Hz 1.5kw | AC220V 50~60Hz 1.8kw | |
External dimensions | L1000mm*W1100mm*H1650mm | L1000mm*W1100mm*H1650mm | L1000mm*W1100mm*H1650mm | |
weight | 550KG | 550KG | 600KG |
project | Configuration options | function declaration | configure |
Z axle construction | Dual valve structure is configured and not adjustable | 1 spray valve, 1 glue valve | standard configuration |
Double valve structure is configured, and the spacing can be adjusted | Two spray valves or glue valves, minimum spacing 70mm, maximum spacing 200mm | selectable | |
The configuration of three valves is not adjustable | 2 spray valves, 1 glue valve | selectable | |
Three valve structure is configured, and the spacing can be adjusted | 3 spray valves or glue valves, minimum spacing 70mm, maximum spacing 130mm | selectable | |
Four valve structure is configured, and the spacing can be adjusted | 4 spray valves or glue valves, minimum spacing 70mm, maximum spacing 100mm | selectable | |
Four valve structure is configured, and the spacing can be adjusted | 2 spray valves, 2 dispensing valves minimum spacing 150mm, maximum spacing 200mm | selectable | |
Supply system | Pressure bucket 1 | One 5L and one 2L pressure barrel | standard configuration |
Pressure Tank 2 | One 10L and one 2L pressure barrel | selectable | |
Glue valve | Precision spray valve | Spray width 5-12mm | standard configuration |
Precision dispensing valve | Minimum 2mm | standard configuration | |
Micro atomizing spray valve | The minimum spray width is 3mm, which is suitable for precision coating process | selectable | |
High viscosity spray valve | For high viscosity glue coating process | selectable | |
Three mode spray valve | For high viscosity or thick layer coating processes | selectable | |
Thin film coating valve | For non-atomized coating processes up to 100cps | selectable | |
Other projects | CCD vision system | Assist in programming and Mark point positioning | selectable |
bar code | Product traceability and identification of products | selectable | |
UPS | Voltage stabilizing equipment | selectable | |
Backplane lines | Complete the return of products and fixtures | selectable |